Quotation within 24 hours
MerForge scaffolding hardware logo MerForge Scaffolding & Formwork Hardware

Board Retaining Coupler

Pressed or drop-forged clamp that holds timber toe boards and working platforms onto scaffold ledgers.

Toe Board Fittings

The board retaining coupler traps a timber board against the ledger so toe boards and platform boards cannot slide or lift. MerForge supplies it in two versions from the same line: pressed 2.5 mm sheet steel for cost-effective fleet volume, and a drop-forged body with a thick folded jaw for rough site handling and many hire cycles. Both share the same M12 hand-tightened fixing and the same slim profile that keeps walkways clear.

Available ProcessesDrop-ForgedPressed
Material
Q235 / 45# Carbon Steel
Finish
HDG 45–70 μm / Painted
MOQ
500 pcs
Delivery
15–25 days after deposit and sample approval
Core Features

Core Features

Standard Specifications

Standard Specifications

Dimensions follow EN 74 / BS 1139 series. Custom sizes produced to drawing.

Board Retaining Coupler
ProcessDrop-forged or pressed sheet steel (two versions available)
Product TypeBoard retaining coupler / toe board clamp
Manufacturing ProcessPressed and folded sheet steel, or drop-forged carbon steel body
Material2.5 mm Q235 sheet steel (pressed) / Q235 and 45# steel (forged)
Compatible Tube48.3 × 3.2 mm scaffold tube
FastenerM12 bolt with wing nut or hex nut
Surface FinishElectro-zinc plated / hot-dip galvanized 45–70 μm / painted
Unit WeightApprox. 0.35 kg (pressed) / 0.55 kg (forged)
Standard ReferenceBS 1139 / EN 12811 practice
Recommended Applications

Recommended Applications

Pressed and forged board retaining coupler toe board clamp for scaffolding in application on site
Recommended Applications
  • 01
    Toe BoardsFixing timber toe boards along the edge of every working platform.
  • 02
    Working PlatformsSecuring platform boards so they cannot lift or slide during use.
  • 03
    Rental Fleets & Industrial MaintenanceA consumable restocked in bulk by hire companies; the forged version also suits refinery, plant and shipyard access scaffolds.
Ordering, Packing & Delivery

Ordering, Packing & Delivery

📦 Minimum Order

500 pcs

🏷 Packing

100 pcs per carton, or 200 pcs per woven bag, on steel pallets

🚢 Delivery

15–25 days after deposit and sample approval

Download full specification sheet (PDF)  ·  Includes dimensions, materials, coating options and packing data.

Get a Free Quote

Tell Us What You Need. Get Pricing in 24 Hours.

One email or WhatsApp message is enough.

  • Reply within 24 hours
  • Samples available
  • Export packing included

Prefer email? Write to us directly:

✉ [email protected]

+8615920592749

We reply within 24 hours. Your information is kept strictly confidential. [email protected]

Related Products

Related Products

Request a Quote WhatsApp