OEM/ODM custom manufacturing · Q235B hot-dip galvanized · 2.5–3.0 mm · Clamp length 40–80 mm
Our steel PV middle clamps and side (edge) clamps fix solar module frames onto hot-dip galvanized steel C-channel rails. Stamped and bent from Q235B carbon steel with a ≥45 μm hot-dip galvanized coating, they suit frame heights of 35–50 mm in four standard lengths — and can be matched to your rail series and module size on request.
Middle clamps join two adjacent modules; side (edge) clamps secure the outer row — one fastener system for the whole array.
Hot-dip galvanized Q235B carbon steel as standard; anodized Al-alloy 6063-T5 available for lightweight designs.
Interchangeable for 35, 40, 42, 45 and 50 mm module frame heights — one clamp series covers common panels.
Thicker body versions for high-wind and heavy-snow load regions, galvanized to ≥ 45 μm for long outdoor service.
Supplied with Grade 8.8 hot-dip galvanized bolts and plastic wing nuts for 41-series C-channel rails.
Clamp length, body thickness, slot position and surface finish produced to your drawings.
All parameters can be customized to your drawings or samples.
| Parameter | Common Specification |
|---|---|
| Product Name | Steel PV Middle Clamp & Side (Edge) Clamp |
| Material | Q235B hot-dip galvanized carbon steel; Al-alloy 6063-T5 anodized optional |
| Body Thickness | 2.5 mm, 2.8 mm, 3.0 mm (reinforced version ≥ 2.8 mm) |
| Clamp Length | 40 mm, 50 mm, 60 mm, 80 mm |
| Adapt PV Module Frame Height | 35 mm, 40 mm, 42 mm, 45 mm, 50 mm |
| Matching Fasteners | Grade 8.8 hot-dip galvanized bolt; plastic wing nut for 41-series C-channel rail |
| Surface Treatment | Hot-dip galvanized, coating ≥ 45 μm |
| Manufacturing Process | Stamping, bending, punching, deburring, galvanizing |
| Application | Clamping & fixing PV module frames on steel C-channel support rails |
| HS Reference Code | 7308900000 (declared as PV support component) |
5,000 pcs per specification (negotiable for trial orders and new customers).
Carton boxes on wooden pallets with rust-preventive protection — built for long-distance sea freight.
Typically 15–25 days after order confirmation, depending on quantity and specification.
Tell us your module frame height, rail series, clamp type and quantity. Drawings are welcome — we reply within 24 hours.
Prefer to chat? Message us on WhatsApp →